Posts tagged city
Boulder’s newest trail gets suggested guidelines
Apr 12th
Access expected to go into effect April 24
The newly purchased portion of the Chapman Drive Trail starts at Boulder Canyon roughly at the location of the Red Lion Restaurant and proceeds south, uphill for approximately 1.4 miles.
OSBT recommended that council designate this portion of property as a Habitat Conservation Area (HCA). The guidance from OSBT included the following uses by visitors:
- Mountain bike travel up and down, on trail, from Boulder Canyon to Flagstaff Road;
- Dogs allowed, on leash and on trail, from Boulder Canyon to the junction with the Tenderfoot Trail; and
- Voice and sight control for dogs permitted from the Tenderfoot junction to Flagstaff Road.
Staff is currently in the process of working with the City Attorney’s Office to finalize these proposed uses. Once finalized, there will be a 15-day comment period for public feedback. Unless significant changes are necessary after the input process, access is expected to begin, pursuant to these guidelines, around April 24.
Please check the OSMP.org web site for updates about this process and watch for signage at the trailhead soon. For more information about these changes, contact Jean Koszalka at 303-413-7622.
City of Boulder Press Release
[includeme src=”http://c1n.tv/boulder/media/bouldersponsors.html” frameborder=”0″ width=”670″ height=”300″]
–CITY–
City of Boulder: Nightmare on Arapahoe postponed due to snow
Apr 8th
With a winter storm warning in effect for Boulder, the tree removal work that was planned for Tuesday, April 9, and Friday, April 12, has been rescheduled to April 15 due to the inclement weather forecast.
On Monday, April 15, there will be intermittent lane closures in both directions on Arapahoe Avenue between 18th and 19th streets from 9 a.m. to 3:30 p.m. Contractors working for the City of Boulder Urban Forestry Division will be removing three high-risk trees in preparation for the upcoming Arapahoe Avenue Reconstruction project. The two-lane section of Arapahoe Avenue, between Folsom and 17th streets, is in poor condition and in need of a reconstruction.
During the tree removals, traffic will be directed into the center lane. The work schedule is weather-dependent.
In the 1800 block of Arapahoe Avenue, two silver maple trees with significant trunk cavities and restricted root zones will be removed for safety reasons. In the 2100 block, a Siberian elm will be removed due to past storm damage. These are the only large trees planned for removal as part of the Arapahoe Avenue Reconstruction. The city has contacted adjacent property owners in advance and will explore opportunities to plant replacement trees.
The city’s Urban Forestry Division inspects street trees in neighborhoods and parks for structural integrity and safety using industry-set standards and techniques. For more information about the tree removals, contact Patrick Bohin with the Urban Forestry Division at 303-519-8750 or watch the video at vimeo.com/63247248.
The Arapahoe Avenue Reconstruction project includes reconstruction of the street into concrete, storm drainage improvements, and sidewalk, bus stop, and landscaping improvements, as space and funding allow.The reconstruction is planned to begin in late May 2013 and will be completed in fall 2013. The project is funded by the 2011 voter-approved Capital Improvement Bond, which allowed the city to leverage existing revenues to bond for approximately $49 million to fund projects that address significant deficiencies, such as this one, and high priority infrastructure improvements. A community stakeholder committee prioritized projects to be funded by the bond and Arapahoe improvements were given a high priority due to current deteriorating conditions.
For more information about the Arapahoe Avenue Reconstruction project, contact Noreen Walsh at 303-441-3266 or visit www.bouldertransportation.net > “Projects & Programs” > “Arapahoe Avenue.”
[includeme src=”http://c1n.tv/boulder/media/bouldersponsors.html” frameborder=”0″ width=”670″ height=”300″]
City of Boulder: Input on prairie dog relocation sought
Apr 8th
900 Prairie dogs slated for move
A public meeting is scheduled to discuss a city proposal to relocate up to 900 prairie dogs from city-owned land around Foothills Community Park and from additional open space colonies to city open space land east of Highway 93, south of Coal Creek, and north of Highway 128, south of Boulder. This number has been scaled back to reflect on-the-ground and projected drought conditions. The meeting will be held at 6:30 p.m., Tuesday, April 9, in the Foothills Elementary School Cafeteria, 1001 Hawthorn Ave. Staff from the city will be available to answer any questions, and to receive comments and feedback.
The city is intending to apply for a State of Colorado permit to relocate the prairie dogs from these areas, which are designated as removal areas in the Urban Wildlife Management Plan and the Grassland Ecosystem Management Plan.
The proposed receiving site was previously the site of an extensive 155-acre prairie dog colony that has since died off. The prairie dogs are being removed from multiple city sites with the dogs near Foothills Community Park being moved first.
CITY OF BOULDER PRESS RELEASE– FOR THOSE TOO IGNORANT TO KNOW HOW THE BUSINESS WORKS
[includeme src=”http://c1n.tv/boulder/media/bouldersponsors.html” frameborder=”0″ width=”670″ height=”300″]





















