Posts tagged open
EPA honcha and Colo. senator discuss president’s climate plan
Aug 12th
Sen. Mark Udall to speak at CU Law School on
President Obama’s Climate Action Plan
Recently appointed U.S. Environmental Protection Agency Administrator Gina McCarthy and Colorado Sen. Mark Udall will discuss President Obama’s Climate Action Plan at the University of Colorado Law School on Wednesday, Aug. 14.
The event also will include a panel discussion with former Colorado Gov. Bill Ritter, Colorado Oil and Gas Association President Tisha Schuller and Brad Udall, director of the law school’s Getches-Wilkinson Center for Natural Resources, Energy and the Environment.
The event will be held from 9 to 10:30 a.m. in the Wolf Law Building’s Wittemyer Courtroom on the CU-Boulder campus. The event is free and open to the public. Seating is limited in the courtroom; additional seats will be available in classrooms with a live video feed.
The event is co-sponsored by the Getches-Wilkinson Center and the EPA. The Getches-Wilkinson Center also will host its annual Clyde Martz Summer Water Conference on Aug. 15-16. For more information on the water conference visithttp://www.colorado.edu/law/research/gwc.
For more information on Colorado Law visit http://www.colorado.edu/law/.
-CU-
[includeme src=”http://c1n.tv/boulder/media/bouldersponsors.html” frameborder=”0″ width=”670″ height=”300″]
Arapahoe Avenue closed between 15th and 17th streets on Saturday
Aug 9th
Eastbound Arapahoe Avenue between 17th and Folsom streets will remain open, businesses along Arapahoe Avenue will remain open, and the Boulder Farmers’ Market will remain at its current location. Travelers are encouraged to walk or bike along the Boulder Creek Path, ride buses, or use Canyon Boulevard and the downtown parking garages if driving.
The one-day full closure between 15th and 17th streets is a final step in the first phase of the Arapahoe Avenue Reconstruction project. Phase two is scheduled to begin on Saturday, Aug. 17, when westbound Arapahoe Avenue will be reopened to traffic, and will continue through May 2014. During phase two of the reconstruction, Arapahoe Avenue will have intermittent daytime lane closures; travel in both directions will remain open throughout. The JUMP bus will remain on Arapahoe Avenue, but there may be temporary bus stop closures. Phase two includes irrigation relocation and construction of curbs, gutters, driveways, and sidewalks.
By fall 2014, Arapahoe Avenue will be reconstructed into concrete between Folsom and 15th streets, along with additional enhancements. For more information, call 303-441-3266 or visit www.bouldertransportation.net and select “Arapahoe Avenue Reconstruction.”
To receive email updates about construction project locations and schedules, visit the City of Boulder Email Listspage and select “Public Works News.” For the latest construction traffic information, visitwww.boulderconezones.net and follow @boulderconezone on Twitter.
— CITY —