Boulder Channel 1

Like Us on FacebookFollow Us On TwitterLive on PeriscopeFollow Us on Google PlusFollow Us on PinterestSubscribe to us on Youtube
22 Boom
  • LANDING
  • HOME
    • Sitemap
    • Advertising Rates
      • Sponsors
      • Services
      • Analytics
      • Commercials
      • Websites We Developed
      • C1N Advertising / PR Agency
    • About
      • Press
      • Jobs and Internships
    • Find a City
  • LATEST
    • Videos
    • Retail Shopping
  • SHOWS
    • Auto
    • 22 Boom
    • Route 66
    • Food
    • Music
      • Music Videos
      • Music News
      • Band on the Bricks
    • Movies
    • Home & Garden
    • Ski & Snowboard
    • Fashion
    • Back To C.U.
    • Colorado Magazine
  • NEWS
    • Weather
    • Boulder Chamber
    • Sports
    • Crime
  • BEST IN BOULDER

Seven more OSMP trails opened Friday

Sep 27th

Posted by Channel 1 Networks in Boulder Flood 2013

No comments

 

 

The City of Boulder’s Open Space and Mountain Parks (OSMP) Department opened more trails near Chautauqua, along with several other area trailheads today. On Friday, OSMP opened:

 

  • Enchanted Mesa trail
  • Four Pines trail
  • McClintock trail
  • Kohler Mesa Trail to the Four Pines junction
  • Woods Quarry trail
  • Bobolink trailhead and the South Boulder Creek bike path to the East Boulder Recreation Center
  • Flatirons Vista trailhead. A portion of the Flatirons Vista South trail remains closed.
  • Foothills trailhead. Visitors can park there to access Boulder Valley Ranch and Mesa Reservoir trails. However, the Hogback Ridge remains closed.
  • McC trail

 

All open OSMP trails are listed at http://bit.ly/15msF85 and at BoulderFloodInfo.net. Newly opened trails are currently accessible from dawn to dusk, and visitors must remain on-trail because of potential hazards and safety risks. OSMP stresses that the re-opened trails are substantially different from pre-flood conditions.

 

–CITY–

 

[includeme file=”/media/boulderfloodsponsors.txt]

[includeme src=”http://c1n.tv/boulder/media/bouldersponsors.html” frameborder=”0″ width=”670″ height=”300″]

 

City wants citizen reports to document the flood

Sep 27th

Posted by Channel 1 Networks in Boulder Flood 2013

No comments

 Crowdsourcing map to capture Boulder flood data and stories

The City of Boulder has launched a ‘Community Flood Assessment’ crowdsourcing map to capture flood data and stories from Boulder residents and businesses.  This resident-scientist approach will empower the Boulder community to contribute to our shared learning and documentation of this historic event.

Community submittals are called ‘reports,’ and users can attach photos or videos to enhance their story or data submittals. The easy-to-use map creates geo-located pins associated with specific date-and-time categories like:

  • Flooding;
  • Road damage;
  • Path Damage;
  • Property Damage;
  • Debris; and
  • Overflows.flood aftermath pics 1

Residents are asked to backdate reports, so all users can have a better understanding of what happened and when (i.e. post data when it actually happened, not with the current date and time).

This specific data on place-and-time flooding activities will assist in the city in assessing the entire flood event and help inform future planning efforts.

The mapping application, called Crowdmap (powered by Ushahidi), was originally designed and built to crowdsource crisis information.  The mapping application can be used on a desktop computer and is also Smartphone enabled with apps for both iPhone and Android devices.

Residents are encouraged to read the Crowdmap Terms of Use and Privacy notice.  Once posted, all data, photos and videos become public domain and can be used by all site users including the City of Boulder.

For more Boulder flood information, visit www.BoulderFloodinfo.net or sign up for flood info updates right to your email inbox.

–CITY–

[includeme file=”/media/boulderfloodsponsors.txt]

 

The bill for flood damage (preliminary estimate)= $48,910,000.00

Sep 26th

Posted by Channel 1 Networks in Boulder Flood 2013

No comments

 

City of Boulder releases preliminary flood-related damage assessments

 

The City of Boulder today provided the Federal Emergency Management Agency (FEMA) with a preliminary damage assessment stemming from the storms and floods that started on Sept. 11, 2013. Citywide, the total released today amounts to $48,910,000, although the city has communicated with FEMA that some infrastructure is still under water or covered by debris and cannot be assessed at this time.

UncleSam

 

The following chart provides a more specific breakdown:

 

Open Space and Mountain Parks

 $17,670,000

Parks and Recreation

$2,390,000

Utilities: Water

$3,300,000

Utilities: Wastewater

$2,500,000

Utilities: Stormwater/Flood

$13,850,000

Transportation

$6,000,000

Facilities and Asset Management

$3,200,000

   
Preliminary Damage Assessment Total

$48,910,000

 

OPEN SPACE AND MOUNTAIN PARKS

Approximately 64 percent, or 93 miles of the 145 miles of trails within the OSMP system have significant to severe damage.  Estimates include repair, restoration and/or replacement of trails, ecology, water delivery infrastructure and fencing.

 

PARKS AND RECREATION

Approximately 34 percent, or 35 of the 98 parks and recreation facilities have significant damage.  Estimates include repair, restoration and/or replacement of facilities, structures, playgrounds, multi-use fields and courts, and paths.

 

UTILITIES

Water

Damage estimates include the restoration of erosion that is jeopardizing water delivery pipelines and access roads to critical water infrastructure.

 

Wastewater

Damage estimates include inspecting and cleaning 25 percent of the approximate 400 miles of pipe in the storm sewer system.

 

Stormwater/ Flood

Damage estimates include inspecting and cleaning 100 percent of the approximate 160 miles of pipe in the storm sewer system. Damage estimates include the reconstruction of improved drainageway features, which will require the removal of vast amounts of sediment and debris.

 

TRANSPORTATION

Approximately 1 percent or three miles of the roads, citywide, have been damaged. There are approximately 300 miles of roads that exist within the City of Boulder. It is estimated that approximately 20 percent, or 60 miles of the roads, were covered in debris.

 

The City of Boulder has 60 miles of bike path within the city limits. Approximately, 15 percent, or nine miles, of the path was damaged, based on preliminary estimates.

 

FACILITIES AND ASSESSMENT MANAGEMENT (FAM): BUILDINGS AND STRUCTURES

Eighty-four percent or 306 of the 365 buildings and structures have been assessed.  Utility and parking structures still require assessment. Of those 306 assets, approximately 35, or 9 percent are estimated to have damage.

 

The city will be coordinating closely with county, state and federal authorities to ensure that repair work is conducted properly and in accordance with FEMA reimbursement and quality guidelines. The city appreciates the opportunity to collaborate with our partners and the community’s patience.

–CITY–

[includeme file=”/media/boulderfloodsponsors.txt]

 

« First...220230240«244245246247248»250260270...Last »
  • Boulder Commercials

  • Social

    Facebook



    Twitter


    Tweets by @BoulderCh1News
          All Backyard Fun Munson Farms Art Cleaners Top Hat Supply Apollo Ink - Printing and Design Eldorado Springs Water SnarfBurger Snarf's Sub Shop Cottonwood Kennels O'Meara Volkswagen in Thornton Downtown Boulder Boulder Chamber REM Sleep Solutions Skechers Shoes

          Like Us on FacebookFollow Us On TwitterFollow Us on Google PlusFollow Us on PinterestSubscribe to us on Youtube

          Contact Us

          Site Designed By Channel 1 Networks
          ©2025 Channel 1 Networks.