Travel
Boulder Travel section has our TV travel series, on America, Beaches and 2 lane black top hi-ways. Plus news and featured Travel business profiles.. To advertise please call 303-447-8531
Nightmare in the mountains scheduled
Jun 5th
Boulder County, Colo. – The Boulder County Transportation Department will apply chip seal to 25 miles of county roads beginning this Monday, June 11.
Starting Monday, crews will begin working on Overland Road above Jamestown and work their way down James Canyon, and then Lefthand Canyon all the way to U.S. 36 (Foothills Highway).
The chip application will be followed closely by rollers and sweepers to set the material into the road surface along with the application of a “fog-coat” to further reduce the amount of loose material. The process is expected to take less than a week for each section of road.

2012 chip seal schedule:
Week of June 11
- Overland Road
- James Canyon Drive
Week of June 18
- Lefthand Canyon Drive from James Canyon to U.S. 36
- North 75th Street from south of St. Vrain Road to Highway 66
- St. Vrain Road from 75th Street to Longmont city limits west of Airport Road
Week of June 25
- North 73rd Street from Niwot Road to Clover Basin Drive
- Niwot Road from 63rd Street to the Diagonal Highway (119)
- Jay Road from U.S. 36 to 47th Street
Week of July 2
- Jay Road from 47th Street to 75th Street
- Baseline Road from 55th Street to Cherryvale Road
Schedules are subject to change due to weather and other factors and the projects will cause minor traffic delays. Visitwww.BoulderCounty.org/Transportation for updates.
Applying chip seal to county roads is a cost-effective means of extending their life and reducing potholes. Adding stone chips to pavement after it has sat for more than five years extends the pavement life considerably, allowing for more use of the original overlay. Additionally, the cost of chipping a road is a small fraction of the cost of new paving and chip sealing uses less oil and less material than paving.
“We understand the chip seal can be disruptive to cycling and can make for a rough ride for a period of time,” Boulder County Transportation Director George Gerstle said. “We’ll continue using the smaller chips, which we’ve used for the last two years with good results, and we will continue sweeping and fog-sealing the roads immediately after the chips are applied to create as smooth a surface as possible. However, there will still be impacts and cyclists should expect poorer riding conditions and use caution on these roads for a couple of weeks after the work is completed.”
–
AT LAST: A solution to Hessie mess
Jun 1st
Parking limited near trailhead
Boulder County, Colo. – A free shuttle service will begin carrying passengers from Nederland High School to the Hessie Trailhead this Saturday, June 2 at 8 a.m.
The shuttle runs from 8 a.m. to 8 p.m. on summer weekends and holidays, including Independence Day (July 4) and Labor Day (Sept. 3). Free shuttle details:
- Park at Nederland High School/Middle School
- Shuttle arrives every 15 minutes
- Shuttle does not stop at the Eldora townsite
- Leashed dogs are welcome
- Parking is for day use only; overnight users should make other arrangements

No car needed
To access the trailhead area without a car, combine the shuttle service with RTD’s N route from Boulder to Nederland. During summer months, the N bus stops at the school and provides a direct link to the shuttle service.
Parking and road improvements
The Boulder County Commissioners approved a staff proposal to begin operating the shuttle and make road improvements to address concerns about safety and emergency access to the Hessie Trailhead area.
Enhancements will be made between the junction of Hessie Road and the end-of-pavement at the west end of the Eldora townsite (map) and include road improvements, adding designated road shoulder parking, new regulatory parking signage and increased parking enforcement.
Road construction is underway and parking will be very limited near the trailhead this weekend, June 2-3. Users are encouraged to take the shuttle from Nederland. Intermittent road closures are likely until June 8. When construction is complete, limited parking will be available between designated signs. Violators will be fined $50 or towed for blocking traffic.

For more details and project overview and history, visit www.HessieTrailhead.com.
The Hessie Trailhead is operated by the U.S. Forest Services and is a popular access point to the Indian Peaks Wilderness and several lakes and trails. Visit the USFS Hessie Trailhead webpage for more information.
Niwot gets open space trail loop
May 8th
Boulder County, Colo. – The Boulder County Commissioners and Boulder County Parks and Open Space staff will host a grand opening and ribbon-cutting for the Dry Creek Trail this Thursday, May 10 from 3-4 p.m. at the Lefthand Valley Grange Trailhead.
The Dry Creek Trail is a new 2.5-mile soft surface multiuse trail from Lefthand Valley Grange Park, along Dry Creek, to Niwot Road. The trail completes the loop in the Niwot Trails system and allows community residents to recreate and commute off-street throughout town.

Project partners include the Niwot Community Association, Niwot High School, Niwot Sanitation District and the St. Vrain Valley School District. The trail is part of the Niwot Trails Master Plan that was approved by the Board of County Commissioners in July 2006.
Visit the Niwot Trails website for more information about the trail system, including maps, recreation opportunities and the Niwot Trails Master Plan.





















