Posts tagged Arapahoe Avenue
CIP bonds building a head of steam
Jul 28th
Just six months into the implementation of the Capital Improvement Bond, three projects have already been completed and 13 more are currently under construction. The community projects are funded by the voter-approved bond, a citywide initiative to address significant deficiencies and high priority infrastructure improvements throughout Boulder.
The city first completed a missing sidewalk link on Gillaspie Drive, along the border of Harlow Platts Park, between Greenbriar Boulevard and Juilliard Street. Next, a new pedestrian crossing was installed at the intersection of Canyon Boulevard and 21st Street. In addition, all of the city’s traffic signalincandescent lamps have been replaced with light-emitting diode (LED) lamps.
“Replacing all of the city’s traffic signals with LEDs is a significant improvement that will make our transportation system more energy efficient and will require less frequent maintenance,” said Director of Public Works for Transportation Tracy Winfree. “Each of the LED lamps will use approximately 80 percent less energy, which will save the city thousands of dollars per year.”
During the next three years, the city will continue to utilize Capital Improvement Bond funds to implement 89 individual projects throughout the community. The projects include roadway reconstruction, park facility upgrades, critical software updates, police equipment needs and a renovation of the Main Boulder Public Library.
The 89 individual projects are grouped into 26 categories and three status types. Three projects have been completed, 13 are under construction, and 73 are in the planning and design phase. Since 85 percent of the bond money must be spent within three years, the city will provide the community with continuous project updates and regular reports on progress toward overall completion.
Other construction project updates include:
- Police equipment replacements are underway, including the assembly of a bomb robot.
- Park shelter replacements and improvements are ongoing at Valmont Park, Palo East Park and Valmont Dog Park.
- Substandard traffic signs are being replaced throughout the city.
- A new multi-use path connection is being constructed on Baseline Road from the Bear Creek Path to U.S. 36.
- Renovations and replacements of existing Parks and Recreation facilities are in progress at Canyon Park, Columbine Park and Palo East Park.
- The South Boulder Recreation Center gym floor and racquetball courts have been replaced and are now being upgraded to achieve full compliance with ADA requirements.
- Deteriorating road pavements are being reconstructed and repaired throughout the city.
- The Columbia Cemetery is being upgraded and enhanced, including irrigation system improvements, new fencing and headstone repairs.
- A new sidewalk is being built on the east side of Folsom Street from Arapahoe Avenue to 200 feet south of Arapahoe Avenue.
“The Capital Improvement Bond is allowing the city to make some significant investments in the community,” said City Manager Jane Brautigam. “These investments help to maintain our valuable existing assets and will improve our quality of life in Boulder.”
Keep an eye out for projects around town!
Capital Improvement Bond signs are posted on site as construction begins so that the community can identify the projects that are funded by the bond. The community can also track the progress of the bond implementation online at www.bouldercolorado.gov/bondprojects.
Boulder’s Capital Improvement Bond
In the November 2011 election, Boulder voters approved a ballot measure that allowed the city to leverage existing revenues to bond for up to $49 million to fund projects that address significant deficiencies and high priority infrastructure improvements. Because the bond was paid for using existing revenues, the measure did not raise taxes.
The bond sale was completed on March 22, 2012. The $49 million bond has a 20-year payback and 85 percent of the total is required be spent by March 22, 2015. As of July 2012, 10 percent of the total funding towards the 85 percent goal has been spent.
For the latest information on construction traffic impacts associated with the bond projects, visit www.boulderconezones.net.
Capital Improvement Bond video series
The website hosts an online video series that highlights what the community can expect to see during the next few years as a result of the Capital Improvement Bond. Each video focuses on different types of investments that the bond will allow the city to make, including transportation, parks, parking, library and downtown. Watch the Capital Improvement Bond videos.
Bear facts: Feed them and they will come
Apr 26th
Pilot program increasing education and enforcement on bear attractants begins this week
The City of Boulder and the Colorado Parks and Wildlife are partnering on an Urban Black Bear Education and Enforcement pilot program that begins on Saturday, April 28. The purpose of the program is to explore the effectiveness of education and enforcement on improving the ways residential trash is secured and other bear attractants are minimized in western Boulder. The pilot neighborhood includes approximately 600 residences west of Ninth Street, north of Baseline Road and south of Arapahoe Avenue.
On Saturday, April 28, staff and volunteers will begin going door-to-door in the pilot neighborhood and provide residents with information on removing bear attractants from their property. They will also discuss the existing state and city laws requiring trash to be secured from bears. Increased enforcement of the trash regulations will begin in June.
A public open house to provide information and answer questions about the pilot program will be held on Monday, April 30, 5:30 to 7:30 p.m., at Flatirons Elementary School, 1150 Seventh St.
Residents are encouraged to participate in an online survey to help determine effective strategies to keep bears out of trash at www.boulderwildlifeplan.net.
Some tips for preventing human-bear conflicts include the following:
- Store trash indoors or in a way that does not allow bears to scatter it. (This is required by city ordinance.)
- Store birdfeeders indoors at night from April to November.
- Store pet food inside.
- Keep BBQ grills clean.
- Keep garage and home doors closed.
For more information about the pilot program, contact Val Matheson, City of Boulder Urban Wildlife, 303-441-3004.
Colorado Parks and Wildlife offers information on how to safely coexist with bears. For more information, visit http://www.wildlife.state.co.us/bears.
If you experience problems with bears or other wildlife, call Boulder Police Department 303-441-3333 or Colorado Parks and Wildlife 303-291-7227.
If you party hearty in Boulder NY’s eve–here’s your ride
Dec 30th
Free and expanded transit service available for New Year’s Eve
The City of Boulder, University of Colorado Student Union, RTD and Special Transit are encouraging New Year’s Eve revelers to take advantage of the following free transit services:
- Free HOP bus service – 9 a.m. on Saturday, Dec. 31, until midnight Sunday, Jan.1, 2012.
- Free Buff Bus, Black, Gold and Silver Line Late Night Transit Service – midnight until 3 a.m. on Sunday, Jan.1, 2012.
- Free RTD services, including bus and Light Rail service, access-a-Ride, skyRide and the SKIP, JUMP, BOUND, DASH and BOLT, after 7 p.m. on Saturday, Dec. 31, until 6 a.m. on Sunday, Jan. 1, 2012.
In addition to the free services, the University of Colorado Buff Bus will augment Late Night Transit services to expand coverage to larger areas of the city. The Buff Bus will provide service on Broadway south to Greenbriar Boulevard and on Baseline Road east to 30th Street up to Arapahoe Avenue. The Silver Line will extend service on Broadway north to Iris Avenue. The Black Line will extend service on Moorhead Avenue south to Table Mesa Drive and the Gold Line will provide service to areas east of downtown to 30th Street from Arapahoe to Iris avenues. These expanded services will allow passengers to access most areas of the city after celebrating the arrival of 2012. As always, you can ask your driver for more information if you are unsure about which bus to take.
The HOP, and all RTD services will operate on a regular Saturday schedule on New Year’s Eve, Saturday, Dec. 31, 2011, on a Sunday/holiday schedule on New Year’s Day, Sunday, Jan. 1, 2012, and on a Saturday schedule on Monday, Jan. 2.
For more information on the free HOP and Late Night Transit Service, call Special Transit at (303) 447-8282. For maps, fares and other information, visitwww.goboulder.net or www.rtd-denver.com.
For real-time arrival information for the HOP, visit www.nextbus.com.