Posts tagged cyclists
Cherryvale construction underway; significant delays expected
Jun 14th
Boulder County, Colo. – The Boulder County Transportation Department has begun construction on Cherryvale Road between Arapahoe and Baseline roads.
Cherryvale is currently open to through traffic, with significant delays expected through August. Cyclists and motorists are encouraged to use detours on 55th and 75th streets to avoid delays.
Daytime road closures may become necessary to expedite certain phases of the road reconstruction and overlay. Any closures will be announced two weeks in advance.
Elements of the Cherryvale project include:
• Widening the roadway approximately 6 feet to improve safety and accessibility for bicycles and pedestrians
• Replacing road culverts to improve drainage
• Construction of a soft-surface pedestrian path on the west side of the road between Reserve Drive and Arapahoe Road
• Reconstruction and overlay of Cherryvale between Baseline and Arapahoe roads
• Reconstruction of Dimmit Drive with turn restrictions implemented at Gapter Road
• Restriping to provide 5-foot bike shoulders
Message boards are located in the area to alert residents of any construction schedule changes. Additional information and updates are available at www.BoulderCounty.org/Transportation.
One-of-a-kind, natural surface bike park to open June 11 in Boulder
Jun 6th
Media interview opportunities available in advance of Valmont Bike Park grand opening
What do you call 40 acres of twisting trails, mild to wild dirt, structural jumps, strategically-placed sand pits, logs, boulders and staircases? While off-road cyclists may soon call it, “Shangri La,” we call it, “Valmont Bike Park.”
Opening for the first time at 9 a.m. Saturday, June 11, the City of Boulder Parks and Recreation Department’s latest park development has already been hailed as an outstanding bike park by the International Mountain Biking Association (IMBA).
“Cyclists from around the nation will be totally floored by what they see,” said IMBA Executive Director Mike Van Abel. “Based on its many options for riding natural-surface trails, the diversity of both technical and non-technical features and the outstanding quality of the build, Valmont will be among the top venues in the country for this style of biking.”
The City of Boulder’s Parks and Recreation Department will open the newly-developed park with a grand opening event from 9 a.m. to 4 p.m. on Saturday, June 11. The event will feature an official ribbon-cutting ceremony at 10 a.m. with comments from council members, including Deputy Mayor Ken Wilson and Parks and Recreation Director Kirk Kincannon. Food and bicycle gear vendors, a cycling demonstration (on the park’s slopestyle features) and public riding in the park will round out the day’s activities. The event is free and open to the community.
The park contains a pump track, dual slalom and slopestyle riding loop as well as elements for a competition cyclo-cross course. The park also includes training and skill building trails, a toddler playground, event plaza, restrooms, parking and outstanding city and Flatiron views. Developed with the support and partnership of the local cycling community, Boulder Mountainbike Alliance (BMA) and organizations such as the PLAY Boulder Parks Foundation and Great Outdoors Colorado, the 40-acre Valmont Bike Park encompasses natural-surface amenities for multiple riding styles and skill levels.
“We are very excited to open this flagship park,” Kincannon said. “We invested in a collaborative partnership with BMA and the off-road cycling community to design and build this portion of Valmont City Park. The result is a park worthy of our internationally-recognized athletic community—one that will be a daily asset to local kids, families, riders and businesses and also attract events and riders from all over the country and the world.”
Note to Media: Media interviews with Parks and Recreation Department Director Kirk W. Kincannon will be available on a scheduled basis on June 7 and 8. The media is encouraged to attend the grand opening event on June 11. Please contact Shelly Ruspakka by June 7 at RuspakkaS@BoulderColorado.gov or 303-413-7214 to set up a media interview or to discuss plans for the opening event.
The bike park is currently closed due to allow completion of construction. The park will open to cycling on June 11. No footage of park use or demonstrations will be available until June 11.
Fourmile Canyon Fire aerial mulching to begin Thursday, April 7 (weather permitting)
Apr 5th
Aerial mulching treatments will consist of certified weed-free straw and WoodStrawÓ being dropped in pre-determined areas from helicopters. Target areas were determined by a set of criteria that includes slope, burn severity, flood/debris flow risk, and values downstream (including human life, safety and property). In total, approximately 1,960 acres will be aerially mulched inside the fire boundary.
Aerial operations will begin on April 7 (weather permitting) in the vicinity of Sugarloaf Road and Fourmile Canyon Drive and move to areas within Sunshine Canyon on or after April 12. Flights will operate for about two weeks (up until April 23) depending on weather conditions throughout the mulching period.
Helicopters will be flying during daylight hours only beginning as early as 7 a.m., and residents can expect temporary road closures as helicopters fly overhead. Additionally, heavy truck equipment will be used in the vicinity of Sugarloaf Road and Sunshine Canyon to deliver straw and support equipment for the aerial flights.
Hand seeding is taking place along roads and driveways in areas that were moderately to severely burned, and with less than 60 percent slope. Roads and driveways are targeted because vehicles are a common way that weed seeds are transported. In total, approximately 500 acres will be seeded utilizing the help of volunteers.
Call the Fourmile Rehabilitation Hotline at 303-413-7010 for the latest updates on seeding and aerial mulching activities. Message boards or flaggers will be located in the vicinity of work being performed to alert residents of any delays or modifications to traffic patterns.
Safety issues
Due to safety regulations and FAA requirements, no one can be in the immediate areas where mulch is being dropped.
Residents and workers in the mulching areas for Gold Hill, Four Mile Canyon, Sugar Loaf and Sunshine Canyon will be asked to leave the area for the day, and bring in pets/livestock while their specific block or neighborhood is being mulched.
Boulder County Sheriff’s patrols will be active in the area to maintain public safety for the duration of the treatments. The Sheriff’s Office asks everyone to be mindful of the following privacy and public safety rules:
- Motorists must not block traffic on any public right of way.
- Everyone must stay at least 200 feet outside of the perimeter of active aerial mulching treatment areas at all times so as not to impede operations.
- No trespassing is allowed on private property including driveways, turn-offs, private roads or other private property.
- Cyclists are asked to avoid Sugarloaf Road, Fourmile Canyon Drive, and Sunshine Canyon Drive while helicopter flights are occurring (April 7-23).
Information resources
For additional information and maps showing the treatment areas go to: www.bouldercounty.org/fourmilefire.