Boulder Channel 1

Like Us on FacebookFollow Us On TwitterLive on PeriscopeFollow Us on Google PlusFollow Us on PinterestSubscribe to us on Youtube
22 Boom
  • LANDING
  • HOME
    • Sitemap
    • Advertising Rates
      • Sponsors
      • Services
      • Analytics
      • Commercials
      • Websites We Developed
      • C1N Advertising / PR Agency
    • About
      • Press
      • Jobs and Internships
    • Find a City
  • LATEST
    • Videos
    • Retail Shopping
  • SHOWS
    • Auto
    • 22 Boom
    • Route 66
    • Food
    • Music
      • Music Videos
      • Music News
      • Band on the Bricks
    • Movies
    • Home & Garden
    • Ski & Snowboard
    • Fashion
    • Back To C.U.
    • Colorado Magazine
  • NEWS
    • Weather
    • Boulder Chamber
    • Sports
    • Crime
  • BEST IN BOULDER

Boulder Creek levels to rise in the next few days

Jun 7th

Posted by Channel 1 Networks in Fires, Floods, Snow extremes

No comments

During the next several days, water levels in Boulder Creek will begin rising noticeably, which could potentially impact underpasses near the creek and the safety of creek activities. With higher temperatures and increased snowpack runoff anticipated, Barker Reservoir is expected to fill and spill as early as Wednesday, June 8.

The current flow in Boulder Creek, at Broadway, is about 200 cubic feet per second (cfs). Following CDOT work to remove debris from Boulder Creek in Boulder Canyon, the city will begin to release water from Barker Reservoir this afternoon in anticipation of the spill. This gradual increase of the creek flows will help to prevent a sudden increase when the reservoir fills. By the end of the day on Tuesday, the flow in Boulder Creek, at Broadway, could reach 500 cfs. Following the reservoir spill, Boulder Creek could reach 600 to 800 cfs, at Broadway. Additional precipitation may further increase the flows.

Anyone recreating in or near Boulder Creek should use caution. City of Boulder and Boulder County safety officials are evaluating the situation to determine when a tubing ban might be warranted.

Boulder police to conduct bomb training exercise on June 8

Jun 7th

Posted by Channel 1 Networks in News

No comments

On Wednesday, June 8, Fairview High School will be the site of a bomb training exercise involving the Boulder Police Department, the Boulder Fire Department, Pridemark Paramedic Service, the FBI, Boulder Valley School District officials and administrators from Fairview and Boulder High Schools. Several students are also volunteering.

There are several objectives for the exercise: to provide the Boulder Valley School District with information and recommendations for dealing with a bomb-related incident on school grounds; to coordinate a multi-agency response and to allow the participating agencies an opportunity to fine-tune their tactics and protocols.

The exercise will begin at 12:30 p.m., and will take place mostly inside the school. School is out for the summer, and there should be no impact on traffic or roads in the area.

Members of the media are invited to attend between 1:30 to 2:30 p.m. For safety reasons and to insure the integrity of tactics used, reporters are asked not to videotape the drill or to photograph or videotape the students who are participating.

Fairview High School is located at 1515 Greenbriar Blvd.

Daytime closures of Lee Hill Drive scheduled for June 13-24

Jun 6th

Posted by Channel 1 Networks in City News

No comments

Boulder County, Colo. – As the final phase of improvements to Lee Hill Drive are implemented, the Boulder County Transportation Department will close a portion of the road from 8:30 a.m. until 4 p.m. on weekdays only from June 13-24.

The daytime closures – between Fourth Street and Olde Stage Road – will begin Monday, June 13 at 8:30 a.m. and will continue on weekdays only until 4 p.m. on Friday, June 24.

If needed, the road will be accessible to emergency vehicles and responders 24 hours a day.

“This closure will allow us to rebuild the road in a way that maximizes pavement life and improves drainage,” capital projects coordinator Tim Swope said. “The process does not allow for daily traffic use during construction. School buses and mail and delivery trucks will be allowed through with some delay, as will anyone living in the construction zone south of Olde Stage.”

No other traffic, including bicycles, will be allowed through the construction zone. Residents of Wagon Wheel Gap and Bow Mountain roads will need to use Linden Drive and Pine Brook Hills for access during the day. Boulder Heights and Olde Stage Road residents will need to use a detour through Lefthand Canyon.

Message boards are located in the area to alert residents of any construction schedule changes and additional information is available at www.BoulderCounty.org/Transportation.

The Lee Hill Drive project, expected to be complete in early July, will provide improved drainage, a new roadway surface, bikeable shoulders on both sides of the road up to the “hogback” formation, and a 5-feet wide climbing shoulder from the hogback up to Olde Stage Road.
-BoulderCounty.org-

« First...630640650«655656657658659»660670680...Last »
  • Boulder Commercials

  • Social

    Facebook



    Twitter


    Tweets by @BoulderCh1News
          All Backyard Fun Munson Farms Art Cleaners Top Hat Supply Apollo Ink - Printing and Design Eldorado Springs Water SnarfBurger Snarf's Sub Shop Cottonwood Kennels O'Meara Volkswagen in Thornton Downtown Boulder Boulder Chamber REM Sleep Solutions Skechers Shoes

          Like Us on FacebookFollow Us On TwitterFollow Us on Google PlusFollow Us on PinterestSubscribe to us on Youtube

          Contact Us

          Site Designed By Channel 1 Networks
          ©2025 Channel 1 Networks.