Posts tagged sidewalks
Tree removals require lane closures Feb. 25 through March 10
Feb 20th
On Monday, Feb. 25, there will be intermittent closures of Balsam Avenue between 14th and 15th streets from noon to 3:30 p.m.
On Wednesday, Feb. 27, there will be intermittent closures of Norwood Avenue between 21st Street and Norwood Court from 8:30 to 11:30 a.m. Also on Feb. 27, the outside lane of northbound Broadway, north of Norwood Avenue, will be closed from noon to 3:30 p.m.
On Thursday, Feb. 28 and Friday, March 1, the southbound lane of Airport Road will be closed from 8 a.m. to 4 p.m. Southbound traffic will be directed into a center lane.
On Monday, March 4, the southbound and right turn lane of Spine Road will be closed north of Lookout Road from 8:30 to 11 a.m. All southbound and turning traffic will be directed through the left turn lane. Also on March 4, there will be intermittent closures of Merritt Drive from Ingersoll Place to Holmes Place between noon and 3:30 p.m.
On Tuesday, March 5, there will be intermittent closures of 55th Street between Blackhawk Road and Tenino Avenue from 9 to 11:30 a.m. Also on March 5, the outside westbound lane of South Boulder Road will be closed from noon to 3 p.m. west of Manhattan Drive.
On Sunday, March 10, the westbound lane of Valmont Road between 28th Street and 30th Street will be closed from 9 a.m. to 3 p.m.
In addition to these tree removals requiring lane closures, contractors working for the Urban Forestry Division will remove two other large trees with significant cavities in their trunks and/or major branches. These include the following:
- A cottonwood tree at the Main Boulder Public Library, 1001 Arapahoe Ave., with a large trunk cavity.
- A silver maple tree at 1743 Mapleton Ave. with large cavities in its major branches
City park and neighborhood street trees are inspected annually for structural integrity and safety by the Urban Forestry Division using industry-set standards and techniques. For more information, contact the Urban Forestry office, 303-441-4406, Monday through Friday from 7 a.m. to 3:30 p.m.
[includeme src=”http://c1n.tv/boulder/media/bouldersponsors.html” frameborder=”0″ width=”670″ height=”300″]
Here comes the snow City of Boulder warning
Oct 24th
City prepares for snowfall and reminds people to remove snow from sidewalks
Current weather forecasts indicate that an incoming storm may produce accumulated snow in Boulder beginning the night of Wednesday, Oct. 24, and continuing through Thursday, Oct. 25. The City of Boulder is preparing snow response crews in advance. Community members are asked to be mindful of the conditions, to prepare their vehicles as appropriate and to plan for extended commute times.
Snow Removal on City Streets
The city’s Public Works Department has snow crews on-call 24 hours a day, seven days a week to respond to changing weather conditions. During snowstorms, 16 plow trucks are active on Boulder’s streets. Six of the trucks distribute a liquid deicer, four spreader trucks distribute traction materials, and six trucks can distribute either material. Fifteen of the plow trucks drive predetermined routes while one “floater” truck responds to problem areas.
During the snowstorm, the city may spot-treat bridges and overpasses as needed to help reduce the buildup of ice and snow. Depending on the weather conditions, a liquid deicer may also be applied to streets and multi-use paths to continue melting the snowpack throughout the snowstorm. Spreader trucks will dispense a crystallized deicer for traction, where appropriate.
consistent with other Front Range communities, the city does not plow all residential streets since Boulder’s sunny climate typically melts most snow within a day or two and because residential plowing would increase costs by an estimated 200 percent. Plowing residential streets would also block driveways and cars parked on the streets. However, problem areas like particularly icy slopes, blocked storm drains or impassable sidewalks can be reported to the city for response. To report roadway or path problems, call the Street and Bikeway Maintenance Hotline at 303-413-7177.
Sidewalk Snow Removal
The Boulder Police Department is responsible for enforcing the city’s sidewalk snow removal ordinance. Property owners, tenants and landlords must clear their sidewalks within 24 hours after snow stops falling. Official snowfall reports are available on the National Weather Service website. Failure to remove snow from sidewalks before the 24-hour deadline may result in a summons and/or an abatement process. Abatement includes the use of a private snow removal contractor to clear the sidewalk. The property owner will be charged a $50 administrative fee, along with the contractor’s fee for removing the snow. To report a sidewalk snow violation, call Code Enforcement at 303-441-3333. Snow should be shoveled onto landscaping, not into the streets. Pushing snow into the streets creates hazards for bike commuters and pedestrians, and gutters clogged with snow may cause ice to form on the sidewalks.
The ICEBUSTERS program pairs residents who are physically unable to clear snow from their sidewalks with someone who can do the work for them. Seasonal and substitute volunteers are needed for this community program. To volunteer or learn more, please call 303-443-1933.
For more information about the city’s snow removal or for winter driving tips, visit www.bouldercolorado.gov/publicworksand click on “Winter Tips” on the left menu.
For code enforcement information, call 303-441-3333 or visit the Boulder Police Department’s website at www.boulder-police.com.
Boulder has enough water for now
May 11th
Â
The City of Boulder’s water supply is expected to meet community water use needs throughout 2012, despite below-average mountain snowpack levels. However, given this year’s dry weather pattern and low snowpack, the city will continue to monitor for drought conditions through 2012 and beyond to assure that water demand projections are on target. In addition, Boulder’s water customers are asked to continue to use water wisely.
Snowpack measurements on May 1, 2012, in the city’s Silver Lake Watershed averaged about 50 percent of what is typical for this time of year. As a result, peak spring streamflow levels will be lower than average.
However, last spring’s exceptionally high snowmelt runoff completely filled the city’s reservoirs on upper Boulder Creek, and the reservoirs stayed full longer, leaving storage levels above average at the beginning of this year. Current measurements indicate that the city’s reservoirs are still projected to fill as the snowpack melts. Additionally, Boulder will have access to an above average amount of water from its western slope supplies, through the Colorado-Big Thompson (CBT) system.
The city compared the evaluation of the current water supply conditions with its Drought Response Plan, which factors in water reserve needs in the event of a multi-year drought. While it was determined that a drought declaration and water use restrictions are not necessary at this time, water customers are still encouraged to continue using water wisely as they have for the past decade.  The community’s water conservation efforts have kept water use at least 15 percent below 2000-2001 levels, since the 2002 drought.
The city recommends water-wise practices by sticking to the following outdoor watering guidelines:
- Water your lawn in the evenings or early mornings, after 6 p.m. or before 10 a.m., and water your lawn every three days.
- Do not over water. Do not water when it is raining or when the soil is already wet.
- Trees, shrubs and vegetable gardens can be watered more effectively with a hand-held hose or low-volume non-spray irrigation, after 6 p.m. or before 10 a.m.
- Check your sprinkler system and make sure it is working properly and that you are only watering landscaping and not the surrounding areas like streets or sidewalks.
For information about the city’s water conservations program, including rebates, strategies and tips, visit www.bouldersaveswater.net.