Wild Bird Center of Boulder
Nov 15th

Videos:
![]() |
![]() |
![]() |
The Wild Bird Center in Boulder is your ultimate backyard bird feeding shop! They specialize in attracting wild birds and nature to your backyard while fostering a healthy and attractive habitat that enhances any home. Birdseed and exclusive seed blends are field-tested and proven to attract the widest variety of birds. Also they offer a selection of feeders, birdbaths, nest boxes, books, media, binoculars, gifts and other bird feeding products second to none.
1641 28th St.
Boulder, CO 80301
303-442-1322
Mon-Fri: 10 to 6
Sat: 9 to 6
Sun: 11 to 5
Email: WBCBoulderCO@aol.com
Sign up for our Newsletter
Saturday Morning: Bird walks leave Wild Bird Center 1641 28th St. Boulder, at 7:30 A.M. rain snow or shine. more info call: 303-442-1322 Map
22 Boom – Boulder Chamber Global Business Networking – Episode 43
Nov 15th
In the first 45 minutes Hear from Congressman Jared Polis and Foundry Group’s Jason Mendelson about current legislative efforts to remove barriers in accessing the highly qualified engineers and innovative entrepreneurs needed to drive growth and job creation in the high tech sector. Brad Hendrick from Caplan and Earnest will provide pointers on navigating the current environment to recruit and retain local and global talent for your growing business. After that insightful meeting have a look at how the Holiday pies are made at Great Harvest in Boulder, Hotshots movie review of Tower Heist and President Obama pardons a turkey from the Thanksgiving dinner table.
Videos in this Episode
-
22 Boom Intro -
Global Business Networking Introduction -
Jared Polis -
Jason Mendelson -
Brad Hendrick -
More from Brad Hendrick -
Question about change -
Question about time frames of visas -
Change and Ignorance -
Limitations of work visas and how are they selected -
The Show Closes -
Baking with Scott – Holiday Pies -
Hotshots Movie Review – Tower Heist -
Thanksgiving Turkey Parade Obama -
Boulder Channel 1 Social Media -
Outro
And more nightmares on Boulder streets
Nov 14th
Starting on Wednesday, Nov. 16, 2011, the Broadway (Euclid to 18th) Transportation Improvements Project will begin construction. The project, previously on hold for federal historic and environmental clearances, was put out for a competitive bid process and a contractor was chosen in late September. The construction along Broadway is expected to take approximately nine months to complete and will be finished by fall 2012.
In general, traffic impacts for fall/winter 2011 include:
- Daytime off-peak lane closures on Broadway, Euclid, and 16th Streets;
- Detours along the Broadway multi-use path near Euclid Avenue; and
- Closures of the northbound bus stop near Euclid Avenue.
- Opening a temporary southbound Broadway left lane at 18th Street
Beginning in late 2011/early 2012, full-time lane reductions on Broadway (from two thru lanes in each direction to one thru lane in each direction) and closure of the cross-streets (16th and Euclid) will be necessary to construct the underpass beneath Broadway. For weekly traffic updates, visitwww.boulderconezones.net.For those traveling through the city, alternate routes are advised. For those traveling on Broadway, alternative modes like walking, biking and taking the bus are good options. Otherwise, please travel slowly and use caution in construction zones.
Remaining project improvements include:
- Construction of a pedestrian/bicycle underpass beneath Broadway at 16th/Euclid;
- Expansion of the northbound and southbound transit stops with additional transit amenities;
- Changing the existing Broadway/Euclid/16th four-way intersection into two “T” intersections;
- Broadway multi-use path improvements; and
- Functional art, urban design, landscaping/irrigation lighting improvements.
Improvements to the Broadway and 18th Street intersection were completed in summer 2011. The newly configured intersection is currently open to traffic, and provides the main vehicular access point from this part of campus to southbound Broadway.
The local match for this project was composed of funding from five agencies: City of Boulder, Boulder County, RTD, CU – including land donation and funding from University of Colorado Student Union and Vice Chancellor for Administration.
For more project information, visit www.bouldertransportation.net>Projects>Broadway (Euclid to 18th) Improvements Project or contact Noreen Walsh at 303-441-3266